Verify the site behind the quote
When evaluating a China aerospace machining factory, confirm the legal entity, physical manufacturing address and which operations are performed there. A website or sales contact does not prove factory ownership, in-house production or approval for an aircraft program.
Review process and quality scope
Provide the controlled drawing, material, quantity and program requirements. Ask which site will perform each operation, which steps are outsourced, and how material, revision and inspection records are controlled. Any certification should be checked for the correct holder, location, scope and validity.
- Confirm the seller and manufacturer identities.
- Verify the manufacturing site and operation routing.
- List material, lot and inspection evidence required.
- Check customer approvals and certificates separately.
- Clarify export, packaging and record responsibilities.
Do not infer aerospace approval
The word factory, the country location or a machining process does not establish AS9100 certification, FAA/EASA approval or customer authorization. Request current documentation for the specific entity and site before relying on such status.
For supplier-screening steps, see aerospace machining company. For a part RFQ, see aerospace CNC machining services.
Record the supply arrangement
Document which company sells the part, which site makes it and who supplies the required records. Recheck the arrangement if the site or outside process changes.
