Advantages

Identify the program stage

State part purpose, revision and approval requirements.

Define material evidence

Name material and lot documents required.

Set inspection criteria

Specify features, methods and acceptance records.

Verify approval scope

Check supplier, site and customer status separately.

Specify Aircraft Machining Work

Define the aircraft component and program

Aircraft machining services may be evaluated for a specific drawing-defined part, but the application alone does not establish approval for aircraft use. Identify the program stage, responsible design authority, part revision and applicable customer requirements before requesting a quote.

Specify material and acceptance evidence

State the material grade, quantity, critical dimensions, finish and required records. Identify how each critical feature will be inspected and who accepts the results. If traceability, first-article inspection or other program documents are required, name them in the RFQ.

  • Provide a released drawing and matching model.
  • Identify manufacturing site and process scope.
  • List material and lot records required.
  • Define inspection reports and acceptance limits.
  • Clarify outside processing and customer approvals.

Check approvals without assumptions

Verify current certificates, customer approvals and regulatory obligations for the entity, location and work scope. Machining a part does not by itself approve it for flight or establish FAA/EASA status.

For general supplier selection, see aerospace machining company. For the manufacturing evidence checklist, see aerospace CNC machining services.

Keep release records aligned

Use the same revision in the quote, production file and inspection plan. Record deviations and approval before shipment.

Frequently Asked Questions

Does aircraft machining mean flight-approved parts?

+

No. Approval depends on the design, supplier, customer program and evidence.

What should an aircraft part RFQ include?

+

Provide drawing, revision, material, quantity, critical features and required records.

Are FAA or EASA approvals automatic?

+

No. Verify the applicable approval for the exact organization and work scope.

What is first-article inspection?

+

It is a program-defined inspection record; state whether and how it is required.

Can outsourced processing be ignored?

+

No. Identify each site and record responsibility required by the program.

Get a Quote