Verify AS9100 Scope for Machining

Verify the certificate and manufacturing site

AS9100 is a quality management system standard used in the aerospace sector. A page title or machining process does not prove that a supplier is certified. If AS9100 is required, request current evidence and confirm the certificate holder, site address, scope, issuer and validity period.

Keep certification separate from part capability

A quality certificate does not prove a specific part is manufacturable or accepted for a program. Review the drawing, material, proposed route, inspection plan and customer approval separately. Identify which site performs each operation and how outside processors are controlled.

  • Check the exact legal entity and location.
  • Confirm the certificate scope covers the quoted activity.
  • Review material, revision and inspection records required.
  • Identify customer or program approvals.
  • Clarify nonconformance and change-control procedures.

Set requirements in the RFQ

List the certificate, site, documentation and part-specific acceptance evidence required. Do not assume full traceability, zero defects or flight approval from a general certification statement.

For supplier screening, see aerospace machining company. For drawing-based tolerance checks, see precision aerospace machining.

Record approval conditions

Keep certificates and customer approvals current for the site and scope. Recheck them if the entity, location, process or program changes.

Frequently Asked Questions

Does this company page claim AS9100 certification?

+

This page does not establish certification status; request current documentation.

What should an AS9100 certificate check include?

+

Verify holder, address, scope, issuer and validity period.

Does AS9100 prove a part is flight-approved?

+

No. Part conformity and program approval require separate evidence.

Is full traceability automatic?

+

No. Specify the records needed and confirm supplier availability.

When should the certificate be rechecked?

+

Before award and after changes to the site, entity, scope or requirements.