Vantaggi

Match the drawing to the model

Keep the approved revision, units, part number, and material consistent across files.

Tie precision to function

Mark the dimensions and datums that control fit or performance.

Set a measurable inspection plan

State how critical features are checked and which records are needed.

Control every design change

Route proposed changes for approval and release a new revision before production.

RFQ checklist for a high precision custom part

Before requesting a quote, check the file set

  • Use one current drawing revision and a matching model.
  • Include units, part number, material standard, quantity, and finish.
  • Show the assembly or mating references that explain the part’s function.

Mark only the features that control performance

Identify bores, interfaces, locating faces, threads, sealing areas, or other dimensions that determine fit or function. Tie each control to the stated datum scheme. Use the general drawing standard for noncritical features unless the design requires a separate tolerance.

Rendere l'accettazione misurabile

For every critical feature, state how it should be measured and what record is required. Confirm units, inspection condition, sample or lot requirements, and any customer-specific documents. Do not use “high precision” as a substitute for a measurable drawing requirement.

Common gaps to resolve before release

  • A model and drawing that show different revisions.
  • A tight tolerance with no datum or clear measurement reference.
  • A finish note that does not identify affected surfaces.
  • A material or inspection document assumed but not included in the purchase scope.

Keep changes under approval

If manufacturability review suggests a material, tolerance, or geometry change, document the proposal and obtain approval from the responsible design authority. Issue revised files and confirm the effect on inspection and quote scope.

Domande frequenti

What makes a custom machined part high precision?

+

The approved drawing defines its functional dimensions, datums, tolerances, and acceptance method. The label alone does not set a numerical precision level.

Should all dimensions use the tightest tolerance?

+

No. Apply tighter controls where the design needs them and use the stated general tolerance for other features.

What should I include with an inspection request?

+

List critical features, datums, measurement method, inspection condition, and required reports or customer documents.

Who approves a tolerance or material change?

+

L'autorità di progettazione responsabile del cliente approva le modifiche alla geometria, al materiale, alla tolleranza o ai criteri di accettazione.

Come viene garantita la qualità?

+

La produzione segue punti di controllo di ispezione con verifica finale della qualità prima della consegna.

Richiedi un preventivo