Vantagens

Lock the stainless grade

Use the material standard and condition from the approved part documents.

Focus on functional features

Identify mounting, sealing, threaded, and mating dimensions that control part use.

Clarify surface treatment

Specify affected surfaces and the point at which final dimensions apply.

Request traceable records

List material and inspection documents required by the purchase scope.

Use the approved material grade

Custom stainless steel parts should follow the grade and condition specified by the approved design. Provide the material standard, part number, quantity, and drawing revision. If an alternative is considered, route it through design approval rather than assuming grades have equivalent properties.

Identify the component’s functional features

Show mounting faces, bores, threads, holes, sealing areas, and the dimensions that control fit. Provide a model with the drawing when useful and ensure that the files match. State units, datums, edge requirements, and inspection records required by the order.

Specify finish and post-processing

Reference any required surface treatment or finish and identify the affected surfaces. Clarify whether dimensions apply before or after the secondary process and whether material or process documentation is needed.

Plan acceptance and traceability

Identify critical features and how they will be checked. If lot identification or material records are required, state that in the purchase scope and confirm what the supplier will provide. Verify any certifications or customer approvals directly for the actual supplier and site.

Compare like-for-like quotations

Use the same grade, condition, revision, quantity, finish, inspection, packaging, and delivery terms across quotes. Review assumptions and exclusions for each operation before award.

Perguntas Frequentes

What should a custom stainless part RFQ contain?

+

Include the approved grade, drawing and model, revision, quantity, functional dimensions, finish, inspection, required records, and delivery terms.

Can a supplier substitute a stainless steel grade?

+

A material change requires review and approval by the responsible design authority before production.

How should surface finish be described?

+

Reference the applicable drawing note or specification and identify which surfaces are covered.

How can material traceability be requested?

+

State which material or lot records are required and confirm they are included in the quotation and delivery scope.

Como é garantida a qualidade?

+

A produção segue pontos de verificação de inspeção com verificação final de qualidade antes da entrega.

Solicite um Orçamento